  • Egyptian Refinery Company(ERC) Project

  • Location : Cairo, Egypt ($2.6 Billion Refinery)

  • Client / PMC : ERC / Worley

  • 6 blast proof Substations (3-4 stories) designed with RC structures / Shallow foundation.

The project is to provide Oil Refinery within Mostorod Petroleum Area and built on a total area of 300,000 m2. The project is made of more than 70,000 tons of steel structure and more than 300,000 cubic meters of reinforce concrete. Designs Review and Modification were conducted for all Process Units of the Refinery project including water treatment plant and utility and service buildings.

The review and modification have been performed for Architecture, Civil, Steel Structure and Geotechnical engineering works. The site technical support and supervision were also included in the scope of work. The project was fast track, where the design is progressing parallel to construction. Moreover, overall plant construction permit obtainment from authority was included.

Overal.png
ss-0.jpg
ERC-Plot Plan (Bldg)-page-001.jpg
ss-4.jpg
ALL_S3-page-045.jpg
ALL_S3-page-046.jpg
ALL_S3-page-047.jpg
ALL_S3-page-048.jpg
ss-2.jpg
ALL_S3-page-051.jpg
ss-3.jpg
ALL_S3-page-052.jpg
IMG_0817.jpg
IMG_0888.jpg
IMG_0816.jpg
ALL_S3-page-022.jpg
ALL_S3-page-026.jpg
ALL_S3-page-030.jpg
20160226_084042.jpg
ALL_S3-page-033.jpg
20151129_063330.jpg
20160716_094847.jpg
20160828_102920.jpg
IMG-20161126-WA0013.jpg

Powered by Squarespace.